Design Approach in Mega Projects
On long-span bridges, load-bearing systems are modeled according to the combination of wind, temperature, and traffic loads. Post-tensioning strands create controlled compression zones in primary structural elements.
Field Application
Stressing operations are planned in phases; force values are recorded at each stage. Duct and anchorage details are critical for long-term performance.
Proper material selection and an experienced field team minimize time and cost risks on mega projects.