Grouting Equipment for Bonded Post-Tensioning
In bonded post-tensioning systems, filling the duct with grout after stressing is mandatory. This creates structural bond between strand and concrete and provides corrosion protection.
ASZ Grup supplies grout pumps, mixers, injection hoses and connection fittings. We also provide technical support for field execution and grouting procedures.
Grouting Process
- Grout mix — Cement-based injection grout with high flowability
- Pumping — Low-pressure, continuous-flow grout pump
- Injection — Grout fill through duct ends with air venting
- Inspection — Completion check and leakage control
Equipment List
- Grout injection pumps (electric / diesel)
- High-speed grout mixers
- Injection hoses and connection nipples
- Air vent and return valves
- Pressure gauges and flow control units
Controlled Pressure
Low-pressure injection preserving duct integrity.
Homogeneous Mix
Mixer systems for consistent grout flowability.
Documentation
Injection volume and duration records.
Site Training
Operator training and procedure support.
Frequently Asked Questions
When should grouting be performed?
Grouting should be completed as soon as possible after stressing and wedge locking — ideally the same day. Delay increases corrosion risk.
Is grouting equipment available for hire or purchase?
Rental and purchase options are available depending on project duration. Contact us for a quotation.
For technical details, catalogues or project-specific quotations, please reach us via our contact page.