Grouting
Equipment

Pumps, mixers and field equipment for bonded post-tensioning grout injection.

Grouting Equipment for Bonded Post-Tensioning

In bonded post-tensioning systems, filling the duct with grout after stressing is mandatory. This creates structural bond between strand and concrete and provides corrosion protection.

ASZ Grup supplies grout pumps, mixers, injection hoses and connection fittings. We also provide technical support for field execution and grouting procedures.

Grouting Process

  • Grout mix — Cement-based injection grout with high flowability
  • Pumping — Low-pressure, continuous-flow grout pump
  • Injection — Grout fill through duct ends with air venting
  • Inspection — Completion check and leakage control

Equipment List

  • Grout injection pumps (electric / diesel)
  • High-speed grout mixers
  • Injection hoses and connection nipples
  • Air vent and return valves
  • Pressure gauges and flow control units

Controlled Pressure

Low-pressure injection preserving duct integrity.

Homogeneous Mix

Mixer systems for consistent grout flowability.

Documentation

Injection volume and duration records.

Site Training

Operator training and procedure support.

Frequently Asked Questions

When should grouting be performed?

Grouting should be completed as soon as possible after stressing and wedge locking — ideally the same day. Delay increases corrosion risk.

Is grouting equipment available for hire or purchase?

Rental and purchase options are available depending on project duration. Contact us for a quotation.

For technical details, catalogues or project-specific quotations, please reach us via our contact page.

Request a Quote

Your Solution Partner for Every Project

Contact us for technical consulting or a quote on post-tensioning systems and products.